Page 2 of 3

The Chophouse

Posted: Sat May 27, 2017 10:54 pm
by wap
Most :impressive: Herr Chops.

Re: The Chophouse

Posted: Sun May 28, 2017 9:47 pm
by rockchops
Got the pvc pipe in today. Lot of work but it works fantastic. This is going to be a major improvement to the current lack of drainage and sump pump basically emptying into itself.Image

The Chophouse

Posted: Sun May 28, 2017 11:44 pm
by wap
[user not found] wrote: Sun May 28, 2017 10:08 pm Would you say you laid the pipe?
:hue:

Re: RE: Re: The Chophouse

Posted: Mon May 29, 2017 10:40 pm
by rockchops
[user not found] wrote:Would you say you laid the pipe?
I am the Luigi to your princess. Not mario, let's not stretch it.

Re: The Chophouse

Posted: Thu Jun 15, 2017 8:14 pm
by rockchops
I have no idea what I was talking about in my last post. Anyways progress has been made. Finished drainage system number 2 tonight.
Image

The Chophouse

Posted: Thu Jun 15, 2017 9:42 pm
by wap
Most :impressive:

Re: The Chophouse

Posted: Sun Jul 23, 2017 5:42 pm
by rockchops
As it sits todayImage

The Chophouse

Posted: Sun Jul 23, 2017 9:50 pm
by wap
rockchops wrote: Sun Jul 23, 2017 5:42 pm As it sits todayImage
Nice!

:jelly:

Re: The Chophouse

Posted: Mon Jul 24, 2017 12:05 am
by Tar
rockchops wrote:As it sits todayImage
:like:

I had to run drainer pipes in my backyard to protect new interlocking that was scheduled to go in shortly afterwards. It made a huge difference to the water drainage in the backyard. 5/7 improvement

Re: The Chophouse

Posted: Wed Feb 28, 2018 9:21 pm
by rockchops
finished second coat of poly on my office floor today. Lighter picture is after sanding before -- floor was covered in heavy shag carpet and the hardwood underneath was in really bad shape (gouged, lots of dirt and paint on it). It's looking pretty good, my first floor work by hand in the house and gotta say I'm pretty impressed.ImageImage

The Chophouse

Posted: Wed Feb 28, 2018 9:29 pm
by wap
:like:

Re: The Chophouse

Posted: Wed Feb 28, 2018 9:30 pm
by Calvinball
Nice work bub!


Sent from the Beer Depository

The Chophouse

Posted: Fri Mar 02, 2018 8:17 am
by ChrisoftheNorth
rockchops wrote: Wed Feb 28, 2018 9:21 pm finished second coat of poly on my office floor today. Lighter picture is after sanding before -- floor was covered in heavy shag carpet and the hardwood underneath was in really bad shape (gouged, lots of dirt and paint on it). It's looking pretty good, my first floor work by hand in the house and gotta say I'm pretty impressed.ImageImage
Excellent work! :impressive:

Re: The Chophouse

Posted: Sat Jan 02, 2021 4:30 pm
by rockchops
Wow been a while since I updated this...The floor pictured above looked great but I decided to put a layer of dark eng hardwood on it, along with the rest of the top floor (which also matches our ground floor). So the whole house will have new engineered hardwood throughout.

This weekend, started in on the bathroom which was an awful tan on tan on beige with a black tile shower (which had buckled because fuck, why would the POs do a job right?). Metal lath with 2 inches of cement, then mortar, then tile. Probably hauled a couple hundred pounds out already, nasty stuff.ImageImageImage

The Chophouse

Posted: Sat Jan 02, 2021 6:49 pm
by wap
:popcorn:

The Chophouse

Posted: Sat Jan 02, 2021 6:50 pm
by wap
Keep the updates coming!

Re: The Chophouse

Posted: Sun Jan 10, 2021 2:03 pm
by rockchops
making good progress on the skylight finishing work...unfortunately the guys who installed them really messed up the existing drywall, and the 2x10s they framed them in are not perfectly straight. A lot of my effort has gone into getting close to perfect 90s in the corners.
Image

The Chophouse

Posted: Sun Jan 10, 2021 8:24 pm
by wap
Man. Out of square would :triggered: me too, for sure.

Re: The Chophouse

Posted: Sun Jan 24, 2021 11:22 am
by rockchops
no more spout or shower or anything...out with the old. In other news I need to get this shit working today because we dont have anothrr shower.
Image

The Chophouse

Posted: Sun Jan 24, 2021 12:50 pm
by wap
:popcorn:

The Chophouse

Posted: Sun Jan 24, 2021 5:32 pm
by Tar
In4updates on completion timelines!

Re: The Chophouse

Posted: Sun Jan 24, 2021 6:31 pm
by rockchops
well, I was pretty busy today...got a fuck ton done. New shower is in, and its fantastic. Had to sweat a bunch of pipe, run new lines, frame shit. Pretty neat. But god damn do i need this shower right now haha
Image

The Chophouse

Posted: Sun Jan 24, 2021 8:48 pm
by wap
:nice:

Re: The Chophouse

Posted: Sat Feb 13, 2021 8:25 pm
by rockchops
I had to redo it all, the valve wasnt recessed enough, so I just ended up reframing the whole area to get everything just right. I have 2 inches between the studs and where the tile needs to sit. I will feather with 1 inch over the existing studs, then 1/2 inch hardiebacker, thinset and a 5/16" tile gets me within 1/4" or so. Image

The Chophouse

Posted: Sat Feb 13, 2021 9:04 pm
by Desertbreh
rockchops wrote: Sat Feb 13, 2021 8:25 pm I had to redo it all, the valve wasnt recessed enough, so I just ended up reframing the whole area to get everything just right. I have 2 inches between the studs and where the tile needs to sit. I will feather with 1 inch over the existing studs, then 1/2 inch hardiebacker, thinset and a 5/16" tile gets me within 1/4" or so. Image
This looks like part of my life I don't regret but won't repeat. Looking fucking good brah.